List of Figures
| Table of Contents | List of Figures | List of Examples | List of Tables | List of Procedures |
- Figure 1-1. Basic System Building Blocks
- Figure 1-2. Chassis Manager Cabling
- Figure 1-3. Service Nodes
- Figure 1-4. Network Connections In a System With Two IRUs
- Figure 1-5. Chassis Manager
- Figure 1-6. VLAN_GBE and VLAN_BMC Network
Connections - IRU View
- Figure 1-7. VLAN_GBE and VLAN_BMC Network
Connections - Rack View
- Figure 1-8. VLAN_HEAD Network Connections
- Figure 1-9. Two InfiniBand Fabrics in a System with Two IRUs
- Figure 2-1. System Admin Controller Power On Button and DVD Drive
- Figure 2-2. YaST Welcome Screen
- Figure 2-3. Hostname and Name Server Configuration Screen
- Figure 2-4. Network Card Configuration Interfaces Screen
- Figure 2-5. Network Card Configuration Overview Screen
- Figure 2-6. Network Address Setup Screen
- Figure 2-7. Hostname and Name Server Configuration Screen
- Figure 2-8. Installation Competed Screen
- Figure 2-9. Cluster Configuration Tool: Initial Configuration Check
Screen
- Figure 2-10. Cluster Configuration Tool: Initial Cluster Setup
Screen
- Figure 2-11. Initial Cluster Setup Tasks Screen
- Figure 2-12. Copy RPMS Sreen One
- Figure 2-13. Copy RPMS Sreen Two
- Figure 2-14. Copy RPMS Screen Three
- Figure 2-15. Cluster Network Setup Screen
- Figure 2-16. Update Subnet Address Warning Screen
- Figure 2-17. Update Subnet Addresses Screen
- Figure 2-18. Update Cluster Domain Name Screen
- Figure 2-19. NTP Time Server/Client Setup Screen One
- Figure 2-20. Advance NTP Configuration Screen
- Figure 2-21. NTP Time Server/ Client Setup Screen Two
- Figure 2-22. Enter up to Five DNS Resolvers Screen
- Figure 2-23. Admin Infrastructure One Time Setup Screen
One
- Figure 2-24. Admin Infrastructure One Time Setup Screen
Two
- Figure 4-1. opensm Software Failover
- Figure 4-2. Two InfiniBand Fabrics in a System with Two IRUs
- Figure 5-1. Ganglia System Monitor
- Figure 5-2. Ganglia System Monitoring Node View