KS10-Based DECSYSTEM-2020 Installation Manual

Company:Digital Equipment Corporation
Part:EK-0KS10-IN-001
Date:1979-09
Keywords:

Table of Contents

  • Chapter 1 Introduction
  • Chapter 2 Planning DECSYSTEM-2020 Installation
    • 2.1 Introduction
    • 2.2 Personnel
    • 2.3 Scheduling
    • 2.4 Prerequisites and Assumptions
    • 2.5 System Installation and Checkout Timeframe
    • 2.6 System Spares
  • Chapter 3 Unpacking and Inspection
    • 3.1 Shipping Area Procedures
    • 3.2 Required Tools
    • 3.3 Sealed Containers
    • 3.4 Packing List
    • 3.5 Shipping Damages
    • 3.6 Opening Shipping Containers
    • 3.7 Inventory
    • 3.8 External Damage Inspection
    • 3.9 Missing Parts Procedures
      • 3.9.1 Short Shipment Procedure
      • 3.9.2 Non-Short-Shipment Missing Items
    • 3.10 Completion
    • 3.11 Shipments Damaged in Transmit
    • 3.12 Returning Damaged Equipment
    • 3.13 Summary
  • Chapter 4 Unit Placement and System Interconnection
    • 4.1 Equipment Movement
    • 4.2 KS10 (2020) Cabinet Handling
    • 4.3 Deskidding Equipment
      • 4.3.1 Deskidding the KS10-A and DNHXX-A (KS10 Style Cabinet)
      • 4.3.2 Deskidding the CR04 Card Reader
      • 4.3.3 Deskidding the LP14/05 Line Printer
      • 4.3.4 Deskidding the RM03 Disk Drive
      • 4.3.5 Deskidding the RP06 Disk Drive
      • 4.3.6 Deskidding the TU45 Magtape Drive
    • 4.4 Equipment Positioning
    • 4.5 Leveling Feet
    • 4.6 Inspection
    • 4.7 Component Checks
    • 4.8 Fastener Checks
    • 4.9 Cabling Checks
    • 4.10 Backplane Checks
    • 4.11 System Cables
    • 4.12 Cable Installation
      • 4.12.1 RP06 Cable Installation
      • 4.12.2 RM03 Cable Installation
      • 4.12.3 TU45 Cable Installation
      • 4.12.4 LP20 Cabling
      • 4.12.5 LA36 CTY Cables
      • 4.12.6 CR04 (DNHXX-A) Installation and Cabling
      • 4.12.7 Communication Cables
      • 4.12.8 DUP11 No. 1 and 2 Synchronous Communications
      • 4.12.9 Remote Diagnosis Cable
  • Chapter 5 Power Checkout
    • 5.1 Prepower Checkout
      • 5.1.1 Customer Voltage Checks
      • 5.1.2 Checking Ground Wires
      • 5.1.3 Power Control
      • 5.1.4 Switch Panel
      • 5.1.5 Peripheral Drawing (BA11K)
      • 5.1.6 Logic Power Wiring
    • 5.2 Power Up Checkout
    • 5.3 Voltage Checks and Adjustments
      • 5.3.1 KS10 PA Backplane
      • 5.3.2 BA11-K Backplane
      • 5.3.3 Peripherals
      • 5.3.4 Conclusion
    • 5.4 DNHXX-A Prepower Checkout
      • 5.4.1 BA11K Prepower Checkout
      • 5.4.2 BA11K Power Wiring
    • 5.5 DNHXX-A Power-Up Checkout
      • 5.5.1 861C Power Controller
      • 5.5.2 BA11-K Power Up Checkout
  • Chapter 6 Standard System Checkout Procedures
    • 6.1 Introduction
    • 6.2 Test Equipment
    • 6.3 Test Software
      • 6.3.1 System Loaders and Monitors
      • 6.3.2 KS10 CPU Functional Processor Diagnostics
      • 6.3.3 Memory Diagnostics
      • 6.3.4 Mass Storage and Communications and Hard Copy Device Diagnostics
    • 6.4 Phase A – 8080 Console Testing
      • 6.4.1 LA36
      • 6.4.2 Power On
      • 6.4.3 Master Reset
      • 6.4.4 Lamp Test
      • 6.4.5 KS10 Bus Operations
      • 6.4.6 Memory Operations
      • 6.4.7 I/O Operations
      • 6.4.8 Fault Detection
      • 6.4.9 CRAM Operation
      • 6.4.10 Remote Link
    • 6.5 Phase B – Loading Diagnostics and Microcode
      • 6.5.1 Loading Diagnostics from Disk
      • 6.5.2 Loading Diagnostics from Magtape
    • 6.6 Phase C – CPU Checkout
      • 6.6.1 Quick Verify CPU Functional Diagnostic String (SMCPU)
      • 6.6.2 Instruction Timing Test
    • 6.7 Phase D – Memory Checkout
      • 6.7.1 Overnight CPU/Memory Reliability Run
    • 6.8 Phase E – Mass Storage Device Checkout
      • 6.8.1 Disk Subsystem Checkout
      • 6.8.2 Disk Overnight Reliability
      • 6.8.3 Magtape Subsystem Checkout
    • 6.9 Phase F – Communications and Hardcopy Device Checkout
      • 6.9.1 LA36 Terminal Diagnostic (DSLTA)
      • 6.9.2 LP20/LP14/LP05 Line Printer Checkout
      • 6.9.3 CR04 Card Reader
      • 6.9.4 Asynchronous Communications Checkout
      • 6.9.5 Synchronous Communications Checkout
  • Chapter 7 Reporting Procedures
    • 7.1 Introduction
    • 7.2 LARS Report Form
    • 7.3 DECSYSTEM-2020 Installation Report
    • 7.4 Daily Log
    • 7.5 LCG Installation Warranty Costs Summary Form
    • 7.6 Installation/Acceptance Report

Copies

Address: http://bitsavers.org/pdf/dec/pdp10/KS10/EK-OKS10-IN_KS10_Install.pdf
Site: Al Kossow's Bitsavers
Format: PDF
Size: 4680816 bytes (4.5 MiB)
MD5: 8633ce589cdec5b4138ba52319965cc8
Mirrors: