MicroVAX Site Preparation

Company:Digital Equipment Corporation
Part:EK-239AC-SP-003
Date:1989-03
Keywords:MicroVAX 3900

Table of Contents

  • Chapter 1 Physical Requirements
    • 1.1 When Your Shipment Arrives
    • 1.2 Space Requirements
      • 1.2.1 Space for Additional Equipment and Cabling
    • 1.3 Operating Environment
      • 1.3.1 Static Electricity
      • 1.3.2 Temperature and Humidity Ranges
      • 1.3.3 Electrical Requirements
      • 1.3.4 Acoustics
  • Chapter 2 Site Preparation Specifications
    • 2.1 Specifications for the BA23 System
      • 2.1.1 Dimensions
      • 2.1.2 Heat, Humidity, Electrical Requirements, and Acoustics
    • 2.2 Specifications for the BA123 System
      • 2.2.1 Dimensions
      • 2.2.2 Heat, Humidity, Electrical Requirements, and Acoustics
    • 2.3 Specifications for the BA213 System and the B213A/B213F Expander
      • 2.3.1 Dimensions
      • 2.3.2 Heat, Humidity, Electrical Requirements, Power Cables, and Acoustics
      • 2.3.3 B213A Expander and B213F Expander: Additional Power Requirements
    • 2.4 Specifications for the BA215 System and the R215F Expander
      • 2.4.1 Dimensions
      • 2.4.2 Heat, Humidity, Electrical Requirements, and Acoustics
    • 2.5 Specifications for the H9642 Cabinet
      • 2.5.1 Dimensions
      • 2.5.2 Heat, Humidity, Electrical Requirements, and Acoustics
    • 2.6 Specifications for the H9644 Cabinet
      • 2.6.1 Dimensions
      • 2.6.2 Heat, Humidity, Electrical Requirements, and Acoustics
  • Appendix Power Cable Order Numbers

Copies

Address: http://manx-docs.org/collections/hcps/239acsp3.pdf
Site: hcps collection
Format: PDF
Size: 11299377 bytes (10.8 MiB)
MD5: 870cf899c885cd57097cbcbc413a6b62